Our Service

ScreenHunter_212

ESD TRAINING GALLERY: 

           Initial and recurrent ESD awareness and prevention training shall be provided to all personnel who handle or otherwise come into contact with any ESDS items. Initial training shall be provided before personnel handle ESDS items.
           The type and frequency of ESD training for personnel shall be defined in the Training Plan. The Training Plan shall include a requirement for maintaining employee training records and shall document where the records are stored. Training methods and the use of specific techniques are at the Or ganization’s discretion. The training plan shall include the methods used by the rganization to verify trainee comprehension and training adequacy.

 

 
ESD Association Standard/ANSI/ESD S20.20-2014
ESD Association Standard for the Developmen t of an Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment(Excluding Electrically Initiated Explosive Devices)
7.0 ESD CONTROL PROGRAM ADMINISTRATIVE REQUIREMENTS
  • 7.1 ESD Control Program Plan
    The Organization shall prepare an ESD Control Program Plan that addresses each of the requirements of the Program. Those requirements include:
    – Training
     – Product Qualification (New)
    – Compliance Verification
    – Grounding / Equipotential Bonding Systems
    – Personnel Grounding
    – ESD Protected Area (EPA) Requirements
    – Packaging Systems
    – Marking
           The ESD Control Program Plan is the principal document for implementing and verifying the Program. The goal is a fully implemented and integrated Program that conforms to internal quality system requirements. The ESD Control Program Plan shall apply to all applicable facets of the Organization’s work.
7.2 Training Plan
Initial and recurrent ESD awareness and prevention training shall be provided to all personnel who handle or otherwise come into contact with any ESD sensitive (ESDS) items. Initial training shall be provided before personnel handle ESDS items. The type and frequency of ESD training for personnel shall be defined in the Training Plan. The Training Plan shall include a requirement for maintaining employee training records and shall document where the records are stored. Training methods and the use of specific techniques are at the Organization’s discretion. The training plan shall include the methods used by the Organization to verify trainee comprehension and training adequacy.
7.3 Product Qualification Plan
A Product Qualification Plan shall be established to ensure that the ESD control items that have been selected meet the requirements in the plan. The test methods and required limits are located in the product qualification columns in Tables 2 and 3. Product qualification is normally conducted during the initial selection of ESD control items. Any of the following methods can be used: product specification review, independent laboratory evaluation or internal laboratory evaluation. For ESD control items that were installed by the Organization before the adoption of this standard, on-going compliance verification records can be used as evidence of product qualification.
7.4 Compliance Verification Plan
A Compliance Verification Plan shall be established to ensure the Organization’s fulfillment of the technical requirements of the ESD Control Program Plan. Measurements shall be conducted in accordance with a Compliance Verification Plan that identifies the technical requirements to be verified, the measurement limits and the frequency at which those verifications occur. The Compliance Verification Plan shall document the test methods and equipment used for making the measurements. If the test methods used by the Organization differ from any of the standards referenced in this document, then there must be a tailoring statement that is documented as part of the ESD Control Program Plan. Compliance verification records shall be established and maintained to provide evidence of conformity to the technical requirements.
The test equipment selected shall be capable of making the measurements defined in the Compliance Verification Plan.
8.0 ESD CONTROL PROGRAM PLAN TECHNICAL REQUIREMENTS
Sections 8.1 to 8.5 describe the key technical requirements used in the development of an ESD Control Program.
The required limits are based on the test methods or standards listed in each table. The Compliance Verification Plan shall document the methods used to verify the limits.

12,604 total views, 2 views today

Leave a Reply

Your email address will not be published.

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>